Mission 109 - 445BG

Go to content

Mission 109

Mission Summaries > June 1944
FRIDAY, 23 JUNE 1944
EUROPEAN THEATER OF OPERATIONS (ETO)
STRATEGIC OPERATIONS (Eighth Air Force):


Mission 435:
At midday, 110 of 134 B-17s and 102 of 106 B-24s attack 12 CROSSBOW (V-weapon) installations, damaging at least 6 of them; 3 B-17s and 2 B-24s are damaged. Fighter support is furnished by 4 P-51 groups (141 of 161 aircraft) all of which afterward strafe transportation targets in the Paris area, destroying 3 locomotives, 100 pieces of rolling stock, and 14 motor vehicles; An exploding ammunition train causes a low-flying P-51 to crash, the only aircraft lost on the mission (pilot is MIA).

Mission 436:
During the late afternoon, 109 B-17s are dispatched to Nanteuil; 13 hit the primary and 2 hit targets of opportunity; the rest abort due to heavy cloud cover; 1 B-17 is lost and 2 are damaged; 1 airman is WIA and 10 MIA. Of 219 B-24s dispatched to airfields in France, 113 hit Juvincourt, 46 hit Leon/Athies, 23 hit Coulommiers and 1 hits Soissons; 6 B-24s are lost, 2 damaged beyond repair and 81 are damaged; 1 airman is KIA, 3 WIA and 58 MIA. Escort is provided by 155 P-47s and 83 P-51s; afterwards part of a P-47 group bombs and strafes a marshalling yard while the remainder of the group bombs and strafes a train carrying trucks and armored cars, destroying the locomotive, 3 trucks, and an armored car, and damaging 20 freight cars.

169 of 195 P-38s fly fighter-bomber missions in the Paris area; 2 P-38s are lost (pilots are MIA).
Target:  Sautricourt, France - V-1 Rocket Launch Site
8th Air Force Mission No:
436
Aircraft Taking Off:
24
Aircraft Dispatched:
23
Aircraft Aborts:
1
Aircraft Over Primary:
22
Aircraft Over Secondary:
0
Aircraft Over Last Resort:
0
Aircraft Bomb Load:
40x100 lb. AN-M30 General Purpose bombs
10x100 lb. AN-M41 Incendiary bombs
Group Bomb Load:
880x100 lb. AN-M30 General Purpose bombs
220x100 lb. AN-M41 Incendiary bombs
Results:
Excellent
Tactical Mission Report:
445th Bomb Group Mission Report

    1.             A/C Scheduled -----------------------
                    A/C Airborne -------------------------
                    A/C Dispatched ----------------------
                    A/C Returned Early -----------------  
                    A/C Over Target ---------------------
                    A/C Returned ------------------------

    2.   Assembly:  

     3.   Route In:  

     4.   Bomb Run:  

     5.   Route Out:  

    6.   Enemy Fighters:  

     7.   Fighter Support:  

    8.   Flak:  
Losses:
     None.
Note:
     None.
Sautricourt, France - V-1 Rocket Launch Site
Image courtesy of National Collection of Aerial Photographs ©
Back to content